Bathroom hardware installation sequence and skills introduction

In the process of bathroom decoration, hardware products play an essential role. Proper installation of bathroom hardware should consider ergonomics, align with residents' daily habits, and be designed for ease of use. Today, we’re going to share some key knowledge about the installation order and techniques for bathroom hardware, helping you achieve a more functional and stylish bathroom. **Bathroom Hardware Installation Sequence** 1. Install wall tiles 2. Hang the suspended ceiling 3. Lay floor tiles 4. Install toilets, sinks, and bathtubs 5. Connect drains 6. Mount lights, outlets, and mirrors 7. Fix towel bars and other hardware accessories **Installation Steps for the Toilet** - Check the floor drain pipe - Align the nozzle - Level and mark the position - Drill the hole - Apply putty and rubber gasket - Secure with a nut - Position the water tank on both sides - Insert the bolt and tighten it - Lift the tank into place and secure with another nut - Install the water elbow and flush valve - Place the float ball and adjust the flush mechanism **Installation Steps for the Sink** - Insert expansion bolts - Tighten them securely - Hang the pipe rack - Place the sink on the rack and check for level - Connect the water supply lines - Ensure all connections are straight and tight **Installation Steps for the Bathtub** - Install the water inlet - Seal the opening properly - Ensure the surface is flat and stable **Key Installation Tips for Bathroom Hardware** 1. **Handle Installation**: Handles should be installed in a way that is ergonomic and easy to use. All handles on the same cabinet should be aligned neatly. The length of screws should match the thickness of the door or drawer. When drilling, make sure the hole size matches the screw diameter. 2. **Door Hinge Installation**: Most doors use two hinges of 100mm length. For solid or shaped doors, it’s recommended to use three hinges or two hinges of 125mm for better stability. 3. **Lock Installation**: After installing the lock, the handle should be positioned between 900-1000mm from the floor. First install the lock body and tongue, ensuring they are flush with the door edge. Close the door, fix the lock plate position, and then install the cover plate, making sure it is aligned perfectly with the door. By following these steps and tips, you can ensure a smooth and efficient installation of your bathroom hardware, enhancing both functionality and aesthetics. Whether you're doing it yourself or hiring a professional, understanding the correct procedures will help you achieve a well-designed and practical bathroom space.

Pipette

Zenith Lab (Jiangsu) Co.,Ltd , https://www.zenithlabo.com