Bathroom waterproof precautions which bathroom waterproof construction steps

Toilets are areas where people frequently use water. In order to prevent leakage, we must do a good job of waterproofing. Waterproofing in the bathroom seems to be very simple. In fact, it is not easy to do it well. There are many things that need attention. So what do we need to pay attention to when we do bathroom waterproofing? Here's everyone to make a detailed understanding with Xiao Bian.

Toilet waterproof precautions

In the actual renovation, some owners think that the developer had done waterproofing before handing in the house, so there is no need to do waterproofing. Actually, this is wrong. First, waterproofing by developers is not very reliable; secondly, even if the waterproofing done by developers is qualified, the waterproof layer will be destroyed in the concrete construction, so the new house must be waterproofed. Xiao Bian suggested that you use a one-component environmentally-friendly polyurethane coating as a waterproof material. This kind of coating is more suitable for bathroom-like pipes and small-area houses with more gaps than general waterproof cement.

Bathroom waterproof precautions II

Spring rain is more, but there are also sunny days. Xiao Bian suggested that you choose a sunny weather to paint waterproof material, rainy weather waterproof material is not easy to dry, will affect the construction effect. The waterproof coating must be painted three times. The dry period of the one-component environment-friendly polyurethane coating is about 3 to 4 days. It is necessary to wait for the waterproof layer to dry before proceeding to the next process.

Toilet waterproof notice three

After the waterproofing is done, the cement slurry can be used, and finally the bricks are laid. We should choose a waterproof, non-slip function of the floor tiles, in paving the floor tiles, to ensure that the brick surface has a drain slope (usually about 1% is appropriate), the slope towards the floor drain, is conducive to the discharge of dirty water. Everyone in the bath, the water will splash on the wall, so the bathroom wall should also be waterproof. In the general waterproofing process, the wall surface is to be treated with a waterproof height of 30 cm. However, for a non-load-bearing lightweight wall, the entire wall should be waterproofed, and at least 1.8 meters high should be achieved.

Bathroom waterproofing notes four

After the toilets are properly waterproofed, we must also conduct a waterproof test to verify that the waterproof is qualified. We first blocked all the sewers of the restrooms and built a "dwarf wall" at the entrance of the restroom to carry out a water injection test. The water injection height was about 10cm. Wait 24 hours for patience. If there is no leakage on the wall and floor of the restroom, there will be no problem with the waterproofing of the restroom. On the contrary, it is necessary to identify leaks and perform timely maintenance.

Waterproofing is an important part of the entire home improvement. In order to ensure the quality of the construction, Xiaobian recommends that you ask a professional master to construct it. The above is Xiaobian's sharing of the waterproof precautions for the bathroom. If you have more related questions, you are welcome to continue to pay attention to Qijia Information.

Stainless Steel Heat Exchanger tubes are appreciated for the feature such as dimensional accuracy, corrosion resistance, easy installation and smooth finishing.

In the company of the support by our skilled professional, Max Stainless Steel are able to manufacture Stainless Steel Heat Exchanger Tubes for our esteemed clients that entirely meet the terms of delivery, specifications and price.

Stainless Steel Heat Exchanger Tube

Stainless Steel Heat Exchanger Tube,Heat Exchanger Stainless Steel Coil Tube,Stainless Steel Heat Exchangers Finned Tube,Stainless Steel Heat Exchanger Pipe

Zhejiang Max Stainless Steel Co.,Ltd , https://www.cnstainlesstube.com