How to install the ground socket?

Ground sockets , as the name suggests, are sockets that are installed on the ground. Mainly used in office spaces, airports, hotels, shopping malls and other large open indoors. The ground plug is no longer restricted by the wall like the switch socket, and the socket avoids the exposed wire of the terminal block due to the long-term plug-in row, thereby being more beautiful and safer. Then, how to install the ground socket? The decoration home decoration network Xiaobian will give you a brief introduction to the installation of the ground socket !



地面插座



First, check before installation

Check carefully before installation to ensure the quality of the socket. If you are not familiar with the socket, you should first determine the live, neutral, ground and tie wires of the socket.

1. Observe whether the installation position of the socket is correct and whether there is any debris in the box;

2. Check if the insulation of the wire entering the appliance is good;

3. Check the metal line protection tube for cracks.




地面插座安装



Second, the installation steps

The ground socket mainly consists of two parts, a bottom box and an upper cover. The installation of the ground plug can be carried out in two steps.

1. The installation of the bottom box

First, determine the installation location. The ground insertion installation is best to choose a relatively dry space location, the bottom box and the metal conduit are reliably connected, and the concrete is poured to fix the bottom box. Second, determine the pre-buried depth. In general, in order to ensure that the upper cover can perfectly fit the ground, the upper end of the bottom box should be 3-5mm below the ground level, so as not to be too prominent to pose a potential danger, and it is not easy to use.

2. Installation of the upper cover

After the concrete is fixed, remove the bottom box cover, clean the dust and debris in the box, and clean the gaps. Secondly, apply anti-corrosion paint around the hole and the concrete material around the hole must be completely dry before installation. Because the ground plug is installed on the ground, it is directly in contact with the tile on the ground. If the anti-corrosion treatment is not carried out, the concrete material that has not been completely dried contacts the metal, and the efflorescence phenomenon occurs, and the cover is corroded. After the anti-corrosion treatment, connect the grounding connection between the bottom box and the upper cover. Finally, fix the top cover.

The above is the introduction of the relevant knowledge of the ground socket installation brought to you by Xiaobian. After installation, it should be noted that the ground socket should be in good contact with the smooth ground to prevent water leakage and cause electric shock; in the kitchen, etc., whoever and where there are, should Put a protective box on the ground to prevent moisture and fumes. Want to know more about the relevant knowledge, please enter the home decoration encyclopedia of the decoration home decoration network!


Aluminum Alloy 2000 Series Bar

Aluminum Alloy 2000 series Bar or Rob  is commonly used for aircraft structural components, truck wheels, medical instruments, and screw machine products.Aluminum 2024 Bar is one of the most widely used aerospace Aluminum Bar with cold finished or extruded aluminum wrought product providing high to moderate strength, very good machinability and weld ability.

1.Dimension: Customized dimension, OEM & ODM

2.Material: A2024 and other series alu alloy        

3.Suface treatment: Anodizing, polishing, turning ,power coating, mill finish etc

4.Equipment: CNC ,extruding machine, cold drawn machine, heating oven, straightening machine, cutting machine  

5.Mechanical Properties

Mechanical Properties of 2024

Temper

Tensile

Hardness

Ultimate

Yield

Elongation

Brinell

KSI

MPA

KSI

MPA

%

T4, T351

68

120

6. STANDARD PACKING:Wooden case/carton
7. Trade Terms

1) Payment: 30% T/T in advance, 70% balance pay before delivery.  L/C at sight.

2) Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.

3) Trade Term can be chosen depending on your requirements.

4) FOB Port: Shanghai


2000 Series Aluminium Bar

2000 Series Aluminium Bar,Aluminum Rod,Aluminium Tube,Aluminum Square Tubing

Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com