Reinforced floor pavement construction process

After cleaning the ground, it is still the first time to lay the mulch, and use a special cross belt to glue the gap. The living room and the dining room are connected, about 9 meters long from north to south.

First to lay the film

After laying the film, the floorboards are in place.

Start from the corner of the living room.

Paving tools

Start paving

To the door of the kitchen, it was found that there was something wrong with the door stone. According to the master's words, the passing stone was too wide. After the layers are laid, the effect is not good.

Do you see the location of the pencil, and the width of the door stone is sufficient here. It is very good to have a bead on it. This is a lesson. Originally wanted to use metal strips, durable stones, and then had to change to a layer of MDF material.

The floor coverings were all finished, and there were baseboards. After the baseboard was finished, the final results were apparent. This is a mallet used for fixing the baseboard to fix the nail.

First nail the wooden rake into the hole in the wall

This is the connection of the baseboard at the corner of the wall. One baseboard is on the wall, and the other is connected to the baseboard in the shape of the baseboard.

Fix the baseboard with nails

Corner (corner angle corner) grind out 45 degree angle convergence will look good

The corner joints also need nails.

Baseboard to the door line to do a "back", the effect is still good, the door line is not very thick, if you directly set the skirting line on the door line, it will leak skirting section, do "Returning" solves this problem.

After installation is this

Basically completed, this is the effect of the restaurant.

Flooring

Other Wind Turbine Generator

Magnet For Turbine Generator,Neodymium Magnets,Turbine Generator

U Polemag Electronics & Technology Co., Ltd. , http://www.xm-magnet.com